Shelbyville, Indiana
Client: First Christian Church
CONTEXT worked in collaboration with Entheos Architects to develop the vision for relocation of this existing congregation to a new site in a developing area of town. The result of a thorough analysis of existing site conditions and a wide array of design concepts, the Master Plan creates a dynamic presence for the church in its new location. The solution capitalizes on existing topography and drainage patterns to meet storm water quality and detention requirements in a sensitive manner while placing the structure in the highest, most visible location on the site.